Introduction
A home remodeling project is the perfect way to breathe new life into your living space. Not only that, but it also adds to its value and makes it more compatible with your current lifestyle. But the transformation is anything but instantaneous. Depending on your home renovation project, it can take anywhere from a few weeks to a few months—even over a year! From the design phase to adding the final touches to everything else in between, here is a look at how much time a home remodel usually takes.
Home Remodeling Timeline Based on Phases
Your timeline depends on a few things and starts all the way from the design phase and lasts till the final touches.
Let’s take a look at how long each stage lasts!
Phase 1: Designs & Blueprints
The first thing you need to do is create the blueprints of all the changes you want to make to your existing structure. If it’s a small- to medium-scale remodel, then the timeline will be around three weeks, but if it’s a large-scale remodel, expect the design phase to last around four months.
Phase 2: Acquiring Permits
Next, after you’re happy with your designs, it’s important to have the legal paperwork approved by the HOA or the city. This phase can easily take up to a month, making the total pre-construction phase last anywhere between two months and five.
Phase 3: Construction & Finishing Touches
The next stage, after all the paperwork has been signed and approved, is the construction phase. This is the most stressful part of the remodeling project and heavily depends on the type of home remodeling project you’re undertaking to set the deadline.
Home Remodeling Timeline Based On Project Types
Let’s take a look at a few of the most common types of home remodeling projects and how long each takes.
- Floor Renovations
Just a basic floor renovation can last anywhere between one and three weeks. Factors such as the material you want to install, the area you want treated, and the time it takes to remove the old flooring heavily influence the timeline. For example, if you want hardwood floors, they will usually need to be dropped off at your home to adjust to the surrounding climate for a few days before the rest of the process can even begin.
- Basement Remodeling
This is a multi-faceted project that can take around one to two months to complete, depending on the size of your basement and how much work needs to be done. If your home remodeling contractors are starting from scratch, this process will involve insulation installation, framing, sub-floors, floors, utilities installation, drywall installation, and painting. And if you want to upgrade the current electrical or plumbing systems, they will extend the timeline too. So, for a finished basement, expect about two weeks on average.
- Bathroom Remodeling:
Now, if you want to redo your bathroom, that’s going to be a bit tricky. A bathroom has lots of moving parts, and the final timeline can often look a bit blurry. From demolishing the old bathroom to installing new plumbing and electrical systems, replacing vanities, toilet installations, and showers, and lastly adding the final touches, your bathroom renovation can easily take up to ten weeks.
- Kitchen Remodeling:
Next comes your kitchen. If an old or plain kitchen is what you want to upgrade, expect to order in or go out regularly for the next several months. A kitchen remodel also involves flooring, electrical upgrades, and plumbing remodels, and if you’re ordering in custom cabinetry and commissioning kitchen islands and special-cut countertops, it can push the deadline even more. Overall, if you want your dream kitchen to become a reality, we advise patience.
- Room Additions
Expanding your home is always going to be more time-consuming and is a work in progress that can last one to two quarters, especially if you’re adding a spare bedroom or a garage. If your home is starting to feel cramped or if you’re looking to add a safe space to park your vehicle, be prepared for a long wait.
- ADU:
Having an accessory dwelling unit on your property is basically like constructing a new mini-home. Whether it’s a detached garage, an in-law suite, or a rental unit you want installed, expect a lead time of the better part of the year for it to be completed. The good thing, though, is that the remodeling crew will not be inside your house, and you can carry on with your daily routine uninterrupted.
Major Home Renovation:
This is the most extensive type of home remodeling project and is usually carried out on old houses that no longer meet today’s safety and comfort standards. Whether it’s your entire property that you’re having revamped or just a few rooms, this type of home remodeling project can last anywhere from nine months to over a year.
Conclusion
A home remodeling project is an extensive and multi-faceted one that can last anywhere from a few weeks up to a year or more. It all depends on your unique project, its type, and any unforeseen circumstances that arise during the process. While knowing the timeline does help, it is important to remember that the lead time is not set in stone, and there are several factors that push the end date back by a few days or even weeks. We hope this article helped you gain a better understanding of how much time a home remodeling project usually takes.
FAQs
How much does a home remodeling project usually cost?
Depending on various factors, your home remodeling project can cost you anywhere between $19441 and $88000+
Which permits do I need for my home remodeling project?
Depending on your type of project, you will need electrical, plumbing, and gas permits, along with zoning and building permits if you’re going to alter the structure.
What is the ROI on a home remodel?
According to experts, it’s up to about 70%